Before starting the floor screed, it is necessary to level it to a certain level. This is done with the help of a hydraulic level. The most elevated place of the room is selected, according to the level of which the screed will be carried out. For convenience, the level is marked on the walls. This is followed by a beacon for applying the solution to the floor. If you are planning a floor screed, then roller shutters will not be superfluous for you. Because roller shutters are a mandatory attribute in apartments where a floor screed was made. Fortunately, now there are roller shutters, the prices for which are affordable to a wide segment of the country’s population. So don’t forget roller shutters.
For durability, you can use a metal mesh that can protect the screed from cracks. According to the instructions, it is also necessary to monitor the moisture content of the screed, if the weather is dry and hot, until the screed is completely dry.
A layer of cement-sand mortar is applied with a 3 cm level. It is advisable to choose sand with a large fraction and high-quality cement for the strength of the screed.
Filling the screed can be the same throughout the apartment, or you can choose the level of each room separately. In the first case, attention is drawn to the thickness of the finishing material, and the level is equalized in accordance with the size of the finish.
Sometimes fluctuations in the floor level are noticed, which requires additional costs. In this case, it is better to use a layer of self-levelling compound, which can dry for two weeks.
Waterproofing is carried out using a thin layer of waterproofing material.